• 0

Project Consultancy, Reports & Profiles


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Low Carbon Silicomanganese
Low Carbon Silicomanganese

Low Carbon Silico Manganese which is popularly known as LCSiMn is a ferrous alloy with content of carbon, silica and manganese. A large number of s... Read More

Capacity :
Low Carbon Silicomanganese: 15,000 MT/Annum
Plant and Machinery cost:
1422.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
55.00 %
TCI :
3936.00 Lakhs
Cost of Project :
3936.00Lakhs
Add To Inquiry Basket
Micronutrients Fertilizer for Banana, Vegetables and Citrus
Micronutrients Fertilizer for Banana, Vegetables and Citrus

Micronutrients are elements which are essential for plant growth, but are required in much smaller amounts than those of the primary nutrients; nit... Read More

Capacity :
Micronutrients Fertilizer for Banana:500 Kgs/Day •Micronutrients Fertilizer for Vegetables:500 Kgs/D
Plant and Machinery cost:
7.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
72.00 %
TCI :
30.00 Lakhs
Cost of Project :
30.00Lakhs
Add To Inquiry Basket
Detergent Cake
Detergent Cake

Detergents are defined as complete washing or cleaning products, which contain among their ingredients an organic surface-active compound (Surfacta... Read More

Capacity :
4MT/Day
Plant and Machinery cost:
18.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
43.00 %
TCI :
228.00 Lakhs
Cost of Project :
228.00Lakhs
Add To Inquiry Basket
Automatic Packaged Drinking Water
Automatic Packaged Drinking Water

It is needless to mention that water, a compound of Hydrogen and Oxygen is a precious natural gift which is very essential for survival of mankind ... Read More

Capacity :
Packaged Drinking Water (1 Ltr. Size):120000
Plant and Machinery cost:
65.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
60.00 %
TCI :
268.00 Lakhs
Cost of Project :
268.00Lakhs
Add To Inquiry Basket
Bicycle Manufacturing
Bicycle Manufacturing

A bicycle, is a human-powered, pedal-driven, single-track vehicle, having two wheels attached to a frame, one behind the other. A bicycle rider is ... Read More

Capacity :
Bicycles (Different Sizes):2000 Nos./Day
Plant and Machinery cost:
270.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.39%
Break Even Point (BEP):
31.24 %
TCI :
3972.00 Lakhs
Cost of Project :
3972.00Lakhs
Add To Inquiry Basket
Laundry Unit
Laundry Unit

There is cleaning requirement everywhere. Cleanliness is the source of beauty and also the placement of God. Laundry unit is one of the unit by whi... Read More

Capacity :
Washing & Iron: 700.0 Pcs/ day
Plant and Machinery cost:
48.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
21.00%
Break Even Point (BEP):
51.00 %
TCI :
145.00 Lakhs
Cost of Project :
145.00Lakhs
Add To Inquiry Basket
Iron Ore Mining (E O U)
Iron Ore Mining (E O U)

An ‘Ore’ may be defined as the aggregate of minerals from which a desired constituent mineral can be extracte... Read More

Capacity :
Iron Ore: 800 MT/Day
Plant and Machinery cost:
779.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
43.00 %
TCI :
2485.00 Lakhs
Cost of Project :
2485.00Lakhs
Add To Inquiry Basket
Active Pharma Ingredients(API)
Active Pharma Ingredients(API)
An active ingredient (AI) is the substance in a pharmaceutical drug or a pesticide that is biologically active. The similar terms active pharmaceutic... Read More
Capacity :
Cephalexin Monohydrate: 500 Kgs/Day, Ampicillin Trihydrate: 500 Kgs/Day,Ibuprofen: 500 Kgs/Day
Plant and Machinery cost:
448.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
46.00%
Break Even Point (BEP):
44.00 %
TCI :
958.00 Lakhs
Cost of Project :
958.00Lakhs
Add To Inquiry Basket
Cast Iron Earth Pipes with Flanges
Cast Iron Earth Pipes with Flanges

Most of the old Cast Iron pipes are cast vertically but this type has been largely superseded by spun iron type manufactured up to a diameter of 90... Read More

Capacity :
2000 NOS./Day
Plant and Machinery cost:
371.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
45.00 %
TCI :
1572.00 Lakhs
Cost of Project :
1572.00Lakhs
Add To Inquiry Basket
MANGANESE SULPHATE
MANGANESE SULPHATE

Manganese sulphate is commercially one of the most important compounds. It is an important mineral based chemical industry. The main constituent of... Read More

Capacity :
600 MT/Annum (Manganese Sulphate)
Plant and Machinery cost:
35.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
47.00%
Break Even Point (BEP):
41.00 %
TCI :
135.00 Lakhs
Cost of Project :
135.00Lakhs
Add To Inquiry Basket
TYRES AND TUBES FOR BICYCLE AND RICKSHAW
TYRES AND TUBES FOR BICYCLE AND RICKSHAW

Tyres and Tubes are the backbone of the bicycle and rickshaw. Bicycle and rickshaw continues to be the principal mode of transport for the low and ... Read More

Capacity :
300000 Nos. Tyres & 300000 Nos. Tubes
Plant and Machinery cost:
158.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
42.00%
Break Even Point (BEP):
53.00 %
TCI :
351.00 Lakhs
Cost of Project :
351.00Lakhs
Add To Inquiry Basket
PACKAGED DRINKING WATER AND PET BOTTLES
PACKAGED DRINKING WATER AND PET BOTTLES

Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that ... Read More

Capacity :
6,00,00,000 Bottles/Annum
Plant and Machinery cost:
217.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
45.00%
Break Even Point (BEP):
60.00 %
TCI :
455.00 Lakhs
Cost of Project :
455.00Lakhs
Add To Inquiry Basket
DISPOSABLE PLASTIC CUPS, PLATES AND GLASSES
DISPOSABLE PLASTIC CUPS, PLATES AND GLASSES

The plastic industry in India plays a very important and key role in industrialization. Disposable cups, glasses, plates are used in daily life now... Read More

Capacity :
150 Lakhs Pcs/Annum Cups, 300 Lakhs Pcs/Annum Glass, 150 Lakhs Pcs/Annum Plates
Plant and Machinery cost:
34.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
42.00%
Break Even Point (BEP):
48.00 %
TCI :
104.00 Lakhs
Cost of Project :
104.00Lakhs
Add To Inquiry Basket
Oxygen and Nitrogen Gas Plant
Oxygen and Nitrogen Gas Plant

Oxygen and nitrogen are the most important industrial gases finding its application in large quantities in metal fabrication and cutting industries... Read More

Capacity :
1200 Cubic Meter/Day
Plant and Machinery cost:
21.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
40.00%
Break Even Point (BEP):
52.00 %
TCI :
68.00 Lakhs
Cost of Project :
68.00Lakhs
Add To Inquiry Basket
Good Future Prospects for E-WASTE RECYCLING PLANT (Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE))
Good Future Prospects for E-WASTE RECYCLING PLANT (Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE))

Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE) is a loose category of surplus, obsolete, broken, or discar... Read More

Capacity :
Monitor -10 Pcs/Day, Plastic Granules – 5.33 M.T/Day, Copper Wire Scrap-9 Kg/day, Glass Scrap
Plant and Machinery cost:
51.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
47.00%
Break Even Point (BEP):
40.00 %
TCI :
196.00 Lakhs
Cost of Project :
196.00Lakhs
Add To Inquiry Basket
E Waste Recycling plant (Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE))
E Waste Recycling plant (Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE))

E-waste is a popular informal name for electronic product nearing the end of their useful life. Computers, televisions, VCR, stereos, copier, and f... Read More

Capacity :
Monitor -10 Pcs/Day, Plastic Dana “ 5.33 M.T/Day,Copper Wire Scrap-9 Kg/day, Glass Scrap from C.R.
Plant and Machinery cost:
51.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
47.00%
Break Even Point (BEP):
40.00 %
TCI :
196.00 Lakhs
Cost of Project :
196.00Lakhs
Add To Inquiry Basket
Single Super Phosphate
Single Super Phosphate

Single Super Phosphate (SSP) Fertilizer industry is the pioneering fertilizer industry in the country and the first SSP plant is said to have been ... Read More

Capacity :
66000.00 MT/Annum
Plant and Machinery cost:
318.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
54.00%
Break Even Point (BEP):
35.00 %
TCI :
2000.00 Lakhs
Cost of Project :
2000.00Lakhs
Add To Inquiry Basket
DRY CLEANING AND LAUNDRY UNIT
DRY CLEANING AND LAUNDRY UNIT
Cleaning requirement is everywhere in the world. Cleanliness is the source of beauty. Dry cleaning and laundry are the best units where dirty clothes ... Read More
Capacity :
210 Pcs. Dry Cleaning/Day, 300 Pcs. Washing & Iron /Day
Plant and Machinery cost:
8.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
45.00%
Break Even Point (BEP):
46.00 %
TCI :
38.00 Lakhs
Cost of Project :
38.00Lakhs
Add To Inquiry Basket
SPONGE IRON PLANT
SPONGE IRON PLANT

Sponge iron is the product created when iron ore is reduced to metallic iron, usually with some kind of carbon (charcoal, etc), at temperatures bel... Read More

Capacity :
135000 MT / Annum
Plant and Machinery cost:
7175.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
42.00%
Break Even Point (BEP):
25.00 %
TCI :
8923.00 Lakhs
Cost of Project :
8923.00Lakhs
Add To Inquiry Basket
INTEGRATED PRODUCTION UNIT OF GYPSUM POWDER, GYPSUM BOARD AND PVC LAMINATED GYPSUM CEILING TILES
INTEGRATED PRODUCTION UNIT OF GYPSUM POWDER, GYPSUM BOARD AND PVC LAMINATED GYPSUM CEILING TILES

INTEGRATED PRODUCTION UNIT OF GYPSUM POWDER, GYPSUM BOARD AND P.V.C. LAMINATED GYPSUM CEILING TILES... Read More

Capacity :
60,000 MT / A (Gypsum Powder), 3000 Thousand Sq. MT/A (Gypsum Board),600 Thousands Sq. MT/A (PVC Lam
Plant and Machinery cost:
840.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
42.00%
Break Even Point (BEP):
57.00 %
TCI :
2352.00 Lakhs
Cost of Project :
2352.00Lakhs
Add To Inquiry Basket
IRON ORE PELLETIZATION PLANT
IRON ORE PELLETIZATION PLANT

Iron ore pellets are used in blast / electric furnaces for producing sponge iron and steels. Market by high productivity, lower fuel consumption an... Read More

Capacity :
1008000 MT/Annum
Plant and Machinery cost:
13800.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
46.00%
Break Even Point (BEP):
55.00 %
TCI :
22400.00 Lakhs
Cost of Project :
22400.00Lakhs
Add To Inquiry Basket
SYNTHETIC IRON OXIDE (Red, Yellow and other Oxides of Iron)
SYNTHETIC IRON OXIDE (Red, Yellow and other Oxides of Iron)

Iron oxides are extensively used in the preparation of paints. There are two main stains yellow and red. Both these varieties are available in synt... Read More

Capacity :
5 MT/ Day
Plant and Machinery cost:
80.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
42.00%
Break Even Point (BEP):
42.00 %
TCI :
400.00 Lakhs
Cost of Project :
400.00Lakhs
Add To Inquiry Basket
TRADING OF IRON ORES
TRADING OF IRON ORES

Steel is considered to be the strongest material in that price. Day to day life and growth of industry and infrastructure in any country totally de... Read More

Capacity :
5000 MT/Day
Plant and Machinery cost:
156.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
52.00%
Break Even Point (BEP):
21.00 %
TCI :
2396.00 Lakhs
Cost of Project :
2396.00Lakhs
Add To Inquiry Basket
Bicycle Plant
Bicycle Plant

As a machine, the bicycle is found to deliver about 75 watts, travelling at 18 kmph on a sustained basis, although on a very short term basis power... Read More

Capacity :
7000 Nos. / Day
Plant and Machinery cost:
5718.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
41.00%
Break Even Point (BEP):
47.00 %
TCI :
7861.00 Lakhs
Cost of Project :
7861.00Lakhs
Add To Inquiry Basket
Concentrated Manganese Ore
Concentrated Manganese Ore

India holds a leading position as a source of manganese ore. The output of this mineral being the third largest in the world. The ore occurs in var... Read More

Capacity :
7500 MT/Annum
Plant and Machinery cost:
127.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
42.00%
Break Even Point (BEP):
40.00 %
TCI :
656.00 Lakhs
Cost of Project :
656.00Lakhs
Add To Inquiry Basket
Artificial Marble Tiles
Artificial Marble Tiles

Plastic floor tiles are known for some time Artificial synthetic marble the invention of the developing affordable resort, virtually replacing the ... Read More

Capacity :
3.00 MT/day
Plant and Machinery cost:
29.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
46.00%
Break Even Point (BEP):
45.00 %
TCI :
154.00 Lakhs
Cost of Project :
154.00Lakhs
Add To Inquiry Basket
Synthetic Iron Oxide
Synthetic Iron Oxide

Synthetic iron oxides possess good tinting strength and excellent hiding powder. It is also light fast, resistant to alkalies and is available in y... Read More

Capacity :
5.00 MT/day
Plant and Machinery cost:
61.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
45.00%
Break Even Point (BEP):
40.00 %
TCI :
286.00 Lakhs
Cost of Project :
286.00Lakhs
Add To Inquiry Basket
Paper Napkins
Paper Napkins

Tissue paper is often used for wrapping as in jewellery, liquors, fruits and florist trades etc. Napkins are manufactured from tissues. Paper napki... Read More

Capacity :
400 Kgs./ Day
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
43.88%
Break Even Point (BEP):
47.25 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Ferroalloys (Ferrosilicon, Ferromanganese & Silicomanganese)
Ferroalloys (Ferrosilicon, Ferromanganese & Silicomanganese)

Ferromanganese are alloys composed of iron and one or two more metals like Mn, Si, Ti, W etc. The ferro alloys have usually lower melting points th... Read More

Capacity :
Ferrosilicon:59.0 MT/Day.,Ferromanganese:167.0 MT/Day.,Silicomanganese:130.5 MT/Day.
Plant and Machinery cost:
2493.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
41.00 %
TCI :
4280.00 Lakhs
Cost of Project :
4280.00Lakhs
Add To Inquiry Basket
Low Carbon Ferromanganese (Medium Grade)
Low Carbon Ferromanganese (Medium Grade)

In igneous rocks, which comprise 95% of the earth's crust the average percentage concentration of manganous oxide is 0.124. This is small in compar... Read More

Capacity :
10 MT/Day.
Plant and Machinery cost:
256.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
65.00 %
TCI :
691.00 Lakhs
Cost of Project :
691.00Lakhs
Add To Inquiry Basket
Packaged Drinking Water with PET Bottles
Packaged Drinking Water with PET Bottles
Profile Water forms an essential part of every human being. Since it is a human necessity it makes best sense to do business in. As a normal human b... Read More
Capacity :
Plant and Machinery cost:
131.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
40.00%
Break Even Point (BEP):
58.00 %
TCI :
350.00 Lakhs
Cost of Project :
350.00Lakhs
Add To Inquiry Basket
MARBLE AND ONYX
MARBLE AND ONYX

Marble is a non-foliated metamorphic rock composed of recrystallized carbonate minerals, most commonly calcite or dolomite. Geologists use the term... Read More

Capacity :
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
1.00%
Break Even Point (BEP):
1.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
ELECTROLYTIC MANGANESE DIOXIDE
ELECTROLYTIC MANGANESE DIOXIDE

EMD is a complex composite of various crystals of manganese and oxygen that is produced through electro-winning. It is used primarily as the active... Read More

Capacity :
Electrolytic Manganese Dioxide 5 MT Per Day
Plant and Machinery cost:
89.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
576.00Lakhs
Add To Inquiry Basket
SODIUM TRI POLY PHOSPHATE
SODIUM TRI POLY PHOSPHATE

PRODUCT PROFILE: Sodium triphosphate (STP) is an inorganic compound with formula Na5P3O10. It is the sodiumsalt of the polyphosphate penta anion, ... Read More

Capacity :
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
FERROALLOYS-FERROMANGANESE, SILICOMANGANESE, FERROSILICON BASED ON ALUMINOTHERMIC PROCESS
FERROALLOYS-FERROMANGANESE, SILICOMANGANESE, FERROSILICON BASED ON ALUMINOTHERMIC PROCESS

The primary objective of the study is to review the technological status of ferroalloys industry in the country in the area of bulk production of s... Read More

Capacity :
12 MT/Day, Ferro Manganese –6 MT/Day, Silico Manganese 3 MT/Day, Ferro Silicon 3 MT/Day
Plant and Machinery cost:
75.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
36.00%
Break Even Point (BEP):
79.00 %
TCI :
242.00 Lakhs
Cost of Project :
242.00Lakhs
Add To Inquiry Basket
SODIUM PETROLEUM SULFONATE
SODIUM PETROLEUM SULFONATE

A sulfonate is a salt or ester of a sulfonic acid. It contains the functional group R-SO2O. Anions with the general formula RSO2O are called Sulfon... Read More

Capacity :
900 MT/Annum
Plant and Machinery cost:
122.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
41.00%
Break Even Point (BEP):
55.00 %
TCI :
307.00 Lakhs
Cost of Project :
307.00Lakhs
Add To Inquiry Basket
HIGH CARBON FERROMANGANESE
HIGH CARBON FERROMANGANESE

Ferroalloys are alloys with iron employed to add chemical elements into molten metal, usually during steelmaking. Ferroalloys impart distinctive qu... Read More

Capacity :
15000 MT/Annum
Plant and Machinery cost:
1032.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
42.00%
Break Even Point (BEP):
67.00 %
TCI :
2319.00 Lakhs
Cost of Project :
2319.00Lakhs
Add To Inquiry Basket
FERROALLOYS - FERROMANGANESE, SILICOMANGANESE, FERROSILICON BASED ON ALUMINOTHERMIC PROCESS
FERROALLOYS - FERROMANGANESE, SILICOMANGANESE, FERROSILICON BASED ON ALUMINOTHERMIC PROCESS

The ferroalloys are classified as bulk ferro alloys & noble ferro alloys. Bulk ferro alloys include ferro chrome/charge chrome ferro manganese,... Read More

Capacity :
1800 MT/Annum Ferro Manganese, 900 MT/Annum Silico Manganese, 900 MT/Annum Ferro Silicon
Plant and Machinery cost:
87.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
40.00%
Break Even Point (BEP):
74.00 %
TCI :
283.00 Lakhs
Cost of Project :
283.00Lakhs
Add To Inquiry Basket
Growing Prospects for Packaged Drinking Water Industry
Growing Prospects for Packaged Drinking Water Industry

Water everywhere, not a CLEAN drop to drink! Who would have thought that there will be a day when sanitation of available water would be more of a... Read More

Capacity :
30,000 Thousand Nos./Annum or 1,00,000 Bottles /day
Plant and Machinery cost:
105.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
44.00%
Break Even Point (BEP):
63.00 %
TCI :
282.00 Lakhs
Cost of Project :
282.00Lakhs
Add To Inquiry Basket
METAL FABRICATION UNIT BASED ON WATER JET CUTTING MACHINE
METAL FABRICATION UNIT BASED ON WATER JET CUTTING MACHINE

Think of a water jet as something with about 30 times the pressure of power washer wand at your local car wash. Power washing at car washes in an e... Read More

Capacity :
750 MT Steel Cutting Job/Annum, 45000 Marble Stone Job work/Annum
Plant and Machinery cost:
132.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
43.00%
Break Even Point (BEP):
56.00 %
TCI :
277.00 Lakhs
Cost of Project :
277.00Lakhs
Add To Inquiry Basket
Sponge Iron Plant
Sponge Iron Plant

-

Read More
Capacity :
50 MT/Day
Plant and Machinery cost:
1300.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
41.00%
Break Even Point (BEP):
45.00 %
TCI :
1800.00 Lakhs
Cost of Project :
1800.00Lakhs
Add To Inquiry Basket
IRON POWDER FROM MILL SCALE SCRAP
IRON POWDER FROM MILL SCALE SCRAP

Iron powder is used to produce particles in desired range for use in powder metallurgy and metallic pigments. Powder iron made electrolytically mak... Read More

Capacity :
2 MT / Day
Plant and Machinery cost:
23.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
46.00%
Break Even Point (BEP):
46.00 %
TCI :
176.00 Lakhs
Cost of Project :
176.00Lakhs
Add To Inquiry Basket
MEDICAL DISPOSABLES: Disposable Syringes (Self Destructive) with Needles, Catheters and Mask
MEDICAL DISPOSABLES: Disposable Syringes (Self Destructive) with Needles, Catheters and Mask

Disposable needle is widely used by ... Read More

Capacity :
0
Plant and Machinery cost:
147.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
43.00%
Break Even Point (BEP):
47.00 %
TCI :
426.00 Lakhs
Cost of Project :
426.00Lakhs
Add To Inquiry Basket
MANGANESE SULPHATE
MANGANESE SULPHATE
Manganese sulphate is commercially one of the most important compounds. It is an important mineral based chemical industry. The main constituent of t... Read More
Capacity :
2.00 MT / Day
Plant and Machinery cost:
31.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
42.00%
Break Even Point (BEP):
41.00 %
TCI :
126.00 Lakhs
Cost of Project :
126.00Lakhs
Add To Inquiry Basket
BENEFICIATION OF CHROMIUM, NICKEL AND MANGANESE ORE
BENEFICIATION OF CHROMIUM, NICKEL AND MANGANESE ORE

Chromium is the 21st most abundant metal in the Earths crust. The only commercial ore of chromium is the chromite. Most chromite ores are rich enou... Read More

Capacity :
30,000 MT/ Annum each ores
Plant and Machinery cost:
896.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
45.00%
Break Even Point (BEP):
49.00 %
TCI :
3528.00 Lakhs
Cost of Project :
3528.00Lakhs
Add To Inquiry Basket
DUCTILE IRON FITTINGS
DUCTILE IRON FITTINGS

There are various processes by which metal can be shaped such as forging, extrusions, pressing, welding, rolling and costing. Among the various pro... Read More

Capacity :
18000 MT / Annum
Plant and Machinery cost:
173.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
45.00%
Break Even Point (BEP):
64.00 %
TCI :
499.00 Lakhs
Cost of Project :
499.00Lakhs
Add To Inquiry Basket
Marble Granite Cutting & Polishing Unit
Marble Granite Cutting & Polishing Unit

It is an important structural & ornamental stone because of its higher compressive strength & durability, is extensively used for massive s... Read More

Capacity :
30000 Sq. Mtr./Annum
Plant and Machinery cost:
196.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
46.00%
Break Even Point (BEP):
78.00 %
TCI :
293.00 Lakhs
Cost of Project :
293.00Lakhs
Add To Inquiry Basket
SG Iron (Ductile Iron) and Alloy Steel Casting
SG Iron (Ductile Iron) and Alloy Steel Casting

S. G. Iron (Ductile Iron) and Alloy Steel Casting

There are various processes by w... Read More

Capacity :
18,000 MT/Annum
Plant and Machinery cost:
168.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
43.00%
Break Even Point (BEP):
66.00 %
TCI :
483.00 Lakhs
Cost of Project :
483.00Lakhs
Add To Inquiry Basket
Manganese from Ferromanganese Alloy Slag Content
Manganese from Ferromanganese Alloy Slag Content

Manganese from Ferromanganese  Alloy Slag Content 30% Read More

Capacity :
5 MT/Day
Plant and Machinery cost:
50.00 Lakhs
Working Capital :
109.00
Rate of Return (ROR):
47.43%
Break Even Point (BEP):
68.36 %
TCI :
226.00 Lakhs
Cost of Project :
226.00Lakhs
Add To Inquiry Basket
Low Carbon Ferromanganese
Low Carbon Ferromanganese

Manganese ores, containing more than 35 % manganese are suitable for the manufacture of high or low grade ferro-manganese. Low carbon ferro mangane... Read More

Capacity :
50 MT/Day
Plant and Machinery cost:
104.00 Lakhs
Working Capital :
885.00
Rate of Return (ROR):
66.12%
Break Even Point (BEP):
40.99 %
TCI :
1129.00 Lakhs
Cost of Project :
1129.00Lakhs
Add To Inquiry Basket
Asphaltic Roofing Sheet
Asphaltic Roofing Sheet

Shelter is a basic need of the human specis. It is one of the basic rights which any human being may claim. Housing remains one of the crucial prob... Read More

Capacity :
3000 Sq.mt/Day
Plant and Machinery cost:
59.00 Lakhs
Working Capital :
31.00
Rate of Return (ROR):
45.16%
Break Even Point (BEP):
47.64 %
TCI :
167.00 Lakhs
Cost of Project :
167.00Lakhs
Add To Inquiry Basket
Wooden Furniture
Wooden Furniture

The furniture making is an ancient art in India before centuries. The expertise of India in manufacturing furniture was accepted by all the parts o... Read More

Capacity :
20 Pcs/Day
Plant and Machinery cost:
4.00 Lakhs
Working Capital :
5.00
Rate of Return (ROR):
111.00%
Break Even Point (BEP):
26.99 %
TCI :
13.00 Lakhs
Cost of Project :
13.00Lakhs
Add To Inquiry Basket
Bicycle Tyres
Bicycle Tyres

Bicycle tyre is the backbone of the cycle industries. There are few numbers of organized manufacturing companies are engaged in the quality grade c... Read More

Capacity :
4000 Nos./Day
Plant and Machinery cost:
36.00 Lakhs
Working Capital :
57.00
Rate of Return (ROR):
59.50%
Break Even Point (BEP):
38.47 %
TCI :
163.00 Lakhs
Cost of Project :
163.00Lakhs
Add To Inquiry Basket
Wooden Furniture (With Mediocre Automation)
Wooden Furniture (With Mediocre Automation)

The term wooden furniture is used for articles of daily use in dwelling house, place of business, public buildings, and includes items such as chai... Read More

Capacity :
20 Articles/Day
Plant and Machinery cost:
13.00 Lakhs
Working Capital :
28.00
Rate of Return (ROR):
42.81%
Break Even Point (BEP):
48.28 %
TCI :
73.00 Lakhs
Cost of Project :
73.00Lakhs
Add To Inquiry Basket
SPONGE IRON
SPONGE IRON

Steel is produced through two process routes; the ore based Blast Furnace-LD Converter route or scrap or DRI based electric arc furnace route. The ... Read More

Capacity :
50 MT/Day
Plant and Machinery cost:
1200.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
41.00%
Break Even Point (BEP):
45.00 %
TCI :
1800.00 Lakhs
Cost of Project :
1800.00Lakhs
Add To Inquiry Basket
A Business Plan For Nicotine From Tobacco Waste
A Business Plan For Nicotine From Tobacco Waste

Nicotine is a naturally occurring chemical compound that is f... Read More

Capacity :
Nicotine 100ml bottle each 3,500 Bottles per day
Plant and Machinery cost:
244.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
1662.00Lakhs
Add To Inquiry Basket
Manufacturing Business Of Blood Bags
Manufacturing Business Of Blood Bags

Blood bags are containers designed to store and transport blood and other related pro... Read More

Capacity :
Blood Bags 10,000 Nos per day
Plant and Machinery cost:
291.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
75.00 %
TCI :
0.00 Lakhs
Cost of Project :
1092.00Lakhs
Add To Inquiry Basket
65 Good Profitable Ideas to Start Small-Scale Manufacturing Business in Nepal
65 Good Profitable Ideas to Start Small-Scale Manufacturing Business in Nepal

An exhaustive manual that o... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Business Of Cashew Nut Processing With Value Added Products (Roasted Cashew, Fried Cashew, Flavored Cashew, Coated Cashew)
Start Business Of Cashew Nut Processing With Value Added Products (Roasted Cashew, Fried Cashew, Flavored Cashew, Coated Cashew)

 

A variety of meth... Read More

Capacity :
-
Plant and Machinery cost:
276.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
67.00 %
TCI :
0.00 Lakhs
Cost of Project :
878.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Plastic Waste Recycling P... Recycled PP Granules : 578 Kgs / Day Recycled LDPE Granules: 720 Kgs / Day Recycled HDPE Granules: 7 26.00 380.00
Start Manufacturing Busin... Baby Diapers (4 Pcs.) 84,000 Pkts Per Day Adult Diapers (4 Pcs.) 18,000 Pkts Per Day Sanitary 29.00 4201.00
Start Tissue Paper Manufa... Tissue Paper 20 MT Per Day 27.00 2101.00
Launching a Solar Panel ... Solar Panel 500 MW per annum 32.00 5353.00
Biodegradable Disposable ... - 27.00 2774.00
Setup Curcumin Extraction... Curcumin Powder 100 Kgs per day Turmeric Oil 47 Kgs per day Deoiled Turmeric 1,853 Kgs 28.00 491.00
Setup Active Pharmaceutic... Paracetamol 10,000 Kgs Per Day Azithromycin 10,000 Kgs Per Day Metformin 10,000 Kgs 33.00 5246.00
Start Manufacturing Of Bl... - 32.00 985.00
A Business Plan For Sanit... Sanitary Napkins 4,800 PKTS per day 27.00 84.00
Start Production Of Potat... Potato Flakes 2 MT Per Day 25.00 563.00
Setup Manufacturing Unit ... Saddle 7,000 Unit Per Day Pedals 10,000 Unit Per Day 31.00 575.00
Opportunity in Sodium Sul... Sodium Sulfide Flakes 10,000 MT Per Annum 30.00 1426.00
Business Plan for Lithium... - 29.00 812.00
Start Manufacturing Busin... Cargo Containers (Size 20 Feet) 34 Nos Per Day 29.00 1992.00
Start Cutting and Grindin... Cutting Disc Size: (115 mm x 1 mm) 2,000 Pcs Pr Day Grinding Disc (115 mm x 6 mm) 2,000 Pcs Pr Day 28.00 423.00
Start Business of Caustic... - 25.00 56500.00
Mink Blankets Production - 27.00 6000.00
A Business Plan for Micro... Micronutrient Fortified Energy Dense Food 100 MT Per Day 28.00 3500.00
Start Crumb Rubber Powder... Crumb Rubber Powder 10 MT Per Day By Product Steel Wire 2 MT Per Day 26.00 303.00
Start Manufacturing of Wo... Wooden Pencils 69,444 Gross Per Day 28.00 2400.00
Start Rice Milling Plant - 28.00 824.00
Setup Plant of Compressed... - 28.00 950.00
A Business Plan for Monoc... Monocrystalline Silicon Ingots 400 Kgs Per Day 28.00 555.00
A Business Plan for Fiber... Fiberglass Tape 24,000 Mtrs. Per Day 28.00 442.00
Ferric Pyrophosphate: Sta... 0 0.00 0.00
Start Production Business... 10 MT per day 45.00 1300.00
Production of Malic Acid ... 0 0.00 0.00
Flat Glass Manufacturing ... 4000 Sq.Mtrs. per day 24.00 18700.00
Start Production Business... Rubber Granules 5 MT per Day By Product Steel Wire 0.5 MT per Day 28.00 20700000.00
Natural Tanning Powder P... 600 MT per Annum 28.00 27000000.00
12345678910...

Showing 181 - 240 of 676 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR